Monday, February 23, 2009

Sign Replacement


The Stop sign at the gate is gone. Probably blown away during recent high winds. I'll look for it tomorrow. Meanwhile, Vic Velelli hand-built a beautiful replacement sign that will go on the east end of the swinging bridge to TNC Ice Mt. Preserve.

We are having Green Flag Graphics in Capon Bridge do lettering. Fine work, Vic!

1 comment:

  1. OK, had some trouble with that.

    Today, we had 12 tons of gravel delivered and spread on bare spots, primarily in the area of Townsend/Vickers lots, where it seems to be moist and previous gravel has disappeared into the road be. More may be done later, in selective bare spots.

    ReplyDelete