Thursday, January 22, 2009
Road grading
We received shipment of IMA's new DR power grader Jan 7th. I assembled it last week, and tried it out, although the road conditions were not ideal for grading. The washboarding was noticeably reduced, although two passes will normally be required to do the job. Using this grader along with Mark Jones' rake, we should be able to keep the road in good shape for the most part, and will save us money over the long run.
Subscribe to:
Post Comments (Atom)
Thank you Vic V. ... Vic C.
ReplyDelete